The assembly solution for container type energy storage system integrates the assembly line, the heavy load handling system and the warehousing system, and the process flow of assembly line includes container loading/unloading, material preassembly, power cable and electrical system assembly, loading PACK to rack & pre-tightening, PACK tightening, wire harness connection, Hipot test & labeling, weak current system debugging and PCS test.
Capacity
60JPH
Uptime
≥95%
Integrated and Intelligent Manufacturing
Our highly integrated, future-ready solutions for large-scale manufacturing maximize operational benefits through efficient ESS container assembly
High integration
The integration of assembly line, heavy load handling system and test system can facilitate the product upgrade and iteration
Automation of key stations
Automated loading of PACK to rack and PACK tightening effectively reduces the labor intensity
Automated logistics system
Auto loading of container, PACK, cabinet and wire harness helps to reduce the labor intensity and avoid potential safety risks.
Product safety control
Quadruple positioning, overpressure protection and anti-drop functions are available for the process of loading PACK to rack so as to ensure the safety of product.
Operator safety control
The stable handling of container, PACK and cabinet provides safety guarantee for operator and prevents safety accidents.